This example teaches how to saw out the rafters of the main roof and build in the parapet trimmings in the area of the existing openings for upright roof windows to be built in, in order to make use of the attic.
Constructional details
- Gable roof as purlin roof.- Eaves angle: 45 degrees.
- Rafter distance: 800 mm.
- Parapet trimming to be joined with steel squares and hexagon-head wood screws. Tail rafter to be joined with mortise-and-tenon joint.
- Steel squares and hexagon-head wood screws to be supplied.
Figure
Hand tools
Hammer, hatchet, bit brace, insert bits of 6.2 mm and 3 mm, wrench with 10 mm opening, mortise chisel 24 mm, planing chisel 35 mm, beating wood
Measuring and testing means
Folding rule, engineer's square, water-level
Auxiliary accessories
Pencil, trestles, batten of 2200 mm length, cover strap of 700 mm length, 40 mm thickness and 120 mm width, cover strap of 700 mm length, 24 mm thickness and 120 mm width, 3.1/70 nails, 10/40 hexagon-head wood screws of diameter 6, clamp iron
Necessary previous knowledge
Measuring, plumbing, scribing, boring, mortising, planing (smoothing), reading of drawings
Explanations to the working drawing
The identification figures allocated to the arrows correspond to the numbers of the working steps in the working drawing.
Sequence of operations |
Comments |
1. Store the tools, auxiliary accessories and parapet trimmings in the attic. |
Do not store them in the immediate working area - danger of accidents! |
2. Erect the trestless and put on the rafter trimmings. |
Ensure stability of the trestles! |
3. Check the parapet trimmings, decide on the joining side and mark with marking-out mark. |
The joining side is the surface of the roof rafters. |
4. Measure the clearance between the trimmer rafters. | |
5. Measure the clearance between the trimmer rafters and tail rafters to be produced. | |
6. Scribe section at left end of parapet trimming and mark with marking-out mark. |
Use a sharp pencil and the engineer's square. |
7. Measure-in, scribe and mark clearance between trimmer rafters, starting from the scribed section line towards the right. |
Place folding rule in parallel with parapet trimming and let folding rule tongues engage properly. |
8. Measure-in and scribe measured size between trimmer rafters and tail rafters, starting from the left scribed section line towards the right. |
Scribe a thin line and place the engineer's square! |
9. Measure-in and scribe mortise length from scribed line 8. towards the right. | |
10. Measure-in and scribe mortise width. |
Measure from the joining side! |
11. Transfer the scribed section lines at both ends of parapet transom onto all timber faces. |
The scribed section lines must be congruent! |
12. Place parapet transom on trestles so that face "1" is on top and then make the mortise. |
Ensure firm support on the trestles! |
13. Saw parapet trimming to length. |
Saw exactly along the scribed pencil line! |
14. Place steel square on both sawn ends of parapet transom, scribe borehole of square and take off square. |
Scribe one side first and then the other one. |
15. Pre-bore holes of 3 mm diameter for screwing in the hexagon-head wood screws. |
Place bit on centre of scribed holes! |
16. Put on steel square, place hexagon-head wood screw and screw it in by wrench. |
Do not overturn the hexagon-head wood screw when tightening it,
otherwise the steel square will not fit snugly. |
17. Place folding rule perpendicularly on tail rafter to be produced and scribe 600 mm size. |
Scribe-mark exactly on bottom side of rafter! |
18. Scribe section. |
Use engineer's square and scribe thin line! |
19. Scribe tenon length and mark with marking-out mark. |
Tenon length - engineer's square width, measure towards roof ridge! |
20. Measure-in and scribe tenon thickness. |
Measure from surface of rafter downwards! |
21. Nail cleat for stiffening of rafter to bottom side. |
Saw off cleat of approx. 200 mm length from cover strap (24 mm
thick)! |
22. Determine and scribe inclination of cover strap (50 mm thick) for stiffening of rafter and tack cover strap (24 mm thick) with its end face. |
Inclination of about 55 degrees is equal to a ratio of 1
(horizontal) : 1.33 (vertical). |
23. Place cover strap for stiffening, scribe face and length and prepare cover strap. | |
24. Place the prepared cover strap (50 mm thick) under the rafter with one end to contact the cleat and the faced end on the floor. Loosen the tacked cover strap (24 mm thick), shift it to the faced end, drive it towards the eaves angle and nail it on. |
Do not pull out the tack-nail off the cover strap! |
25. Nail 24 mm cover strap firmly. |
Drive in three 3.1 mm diameter nails, 70 mm shank length (nails 3.1/70). |
26. Place the 2200 mm batten perpendicularly on the floor contacting the rafter on top. Plumb the batten and scribe the height line on the rafter. |
Use a water-level! |
27. Continue the height-line scribing horizontally up to the lower edge of the rafter. | |
28. Scribe the section line and mark it with marking-out mark. |
Use the engineer's square for scribing! |
29. Saw out the rafter. |
Saw through on top at first strictly following the scribed line! When the lower end is being sawn through, it is absolutely necessary that a second worker secures the rafter piece to be sawn out against turning off, otherwise there is a great danger of accidents. |
30. Produce tenon on tail rafter. | |
31. Plug on parapet trimming with mortise on tenon of tail rafter, hammer and secure it against turning off. |
Secure by means of clamp iron. Do not fully drive in clamp iron jaws into the wood to avoid splitting of wood! |
32. Align parapet trimming and bore holes through boreholes in screwed-on steel square into one of the two trimmer rafters for screwing-in of hexagon-head wood screws. |
Use 3 mm diameter bits! |
33. Place hexagon-head wood screws and screw them in by means of wrench. |
Do not overturn hexagon-head wood screws when tightening |
34. Bore holes in the other trimmer rafter, place hexagon-head wood screws and screw them in by means of wrench. |
Before boring, press parapet trimming again towards eaves angle and keep pressing when boring. |
35. Complete stiffening of roof rafter, nail cover straps completely, clear working place and prepare for next roof superstructure, place hexagon-head wood screws and screw them in by means of wrench. |
Repeat steps 2. through 34! |
Rafter trimming for upright roof
window with lean-to dormer
roof